After years of institutional failure, diplomatic faux-pas, and bad-faith policy, we are pleased to finally be able to share a rare piece of positive Brexit news. historic plans or photographs; For any alterations, replacement, or installation of features such as windows, doors and shopfronts, elevation plans and sectional drawings to a scale of 1:20 or less. More information on this can be found at the relevant section of National Planning Practice Guidance on Flood Risk and Coastal Change - http://planningguidance.planningportal.gov.uk/blog/guidance/flood-risk-and-coastal-change/). the provision of a building (or extension) where the proposed floor space is more than 100 square metres; Explain the design principles and concepts that have been applied to the development; Demonstrate the steps taken to appraise the context of the site and its surroundings and how the design of the development takes that context into account; Explain the policy adopted as to access, and how policies relating to access in relevant local development documents have been taken into account; State what, if any, consultation has been undertaken on issues relating to access to the development and what account has been taken of the outcome of any such consultation; and. Core Strategy Policies CS15, UC13 and UC14, Unitary Development Plan Policies C2, C2.2 and C3.1, Unitary Development Plan Policies ENV7, ENV8, ENV9, ENV10, ENV11, ENV12, ENV14, ENV15, ENV16, ENV17, ENV18 and ENV19, Local Plan (2017) DM6.1, DM6.2, S6.5, DM6.6. Proposed new development may necessitate the creation of new highways that can be identified for future adoption by the Highways Authority. If the extent and nature of the minor amendment cannot easily be identified from the submitted material the application will not be made valid until further information or clarification have been received. Therefore the local validation requirements for Sunderland have not been included in this document. Sunlight/Daylight/Microclimate Assessment, Community Infrastructure Levy (Gateshead, North Tyneside and Newcastle only, 1. Some new developments will necessitate the need for works and changes to the local highway network and/or to public rights of way. Registered portal users must not share their user names and passwords with others. without any signatures. This involves supporting GP appraisers through mentoring, and training. The former special industrial use classes, B3 B7, are now all encompassed in B2. If the highways within the development do not fulfil the requirements for future adoption by the Highway Authority then a Management and Maintenance of Estate Streets plan will be required and may be secured in a S106 Agreement for the highways to remain privately maintained. Pre-application advice in terms of the need for a TA, TS or TP should be sought from the relevant LPA / Local Highways Authority to avoid any delay in the determination of the application (see above paragraphs under the heading: v) Pre-application Advice). Registration is free and takes a few minutes. The statement should contain layouts (annotated in square metres) to demonstrate that all rooms within the property can; (a) comfortably accommodate the required basic items of furniture, and (b) provide enough circulation space for the intended occupants to safely navigate rooms and perform basic tasks. Planning | North Tyneside Council Attenuation systems should be designed to accommodate a critical rainfall event of 1:100 year + 40% allowance for climate change. These details should be cross-referenced with the Design and Access statement where submitted. A noise impact assessment prepared by a suitably qualified acoustician should support applications that raise issues of disturbance or are considered to be noise sensitive developments. This may include technical specification including an acoustic assessment of the extraction system, noise mitigation measures and odour abatement techniques where required. Applicants are therefore required to answer additional questions to enable the Council to calculate your levy liability. All new development with a sensitive end use (including dwellings, allotments, schools, nurseries, playgrounds, hospitals and care homes) require a minimum of a Phase 1 Land Contamination Assessment (often referred to as a Preliminary Risk Assessment) to be submitted. The International Standard for Assessment of Environmental Noise ISO 1996; Acoustics Description and Measurement of Environmental Noise" is the principal standard referred to for environmental noise assessment; BS 4142 Method for rating and assessing industrial and commercial sound (British Standards Institution 2014); BS 8233 Code of Practice for Sound insulation and noise reduction for buildings; (British Standards Institution 2014), World Health Organisation Guidelines for Community Noise (1999). Certificate A must be completed when the applicant is the sole owner of the site. Where a hot food takeaway or restaurant or pub is proposed close to an existing residential property, details of extraction facilities will normally be required for validation purposes What information is required? Local Exhaust Ventilation (LEV) workplace fume and dust extraction (Health and Safety Executive): 32 Sunlight/Daylight/Microclimate Assessment. Download planning application forms. Whilst the outline planning application process allows the minimum level of information to be submitted to enable the application to be made valid, the LPA must then reach its planning decision on the application in line with its development plan and having had regard to any material planning considerations. The level of detail should be proportionate to the assets importance and no more than is sufficient to understand the potential impact of the proposal on their significance. Northumbria University and Tyneside Cinema enjoy a successful partnership which is expressed through a series of collaborations across our organisations that aim to develop and support creative talent in the region. In order to understand the impact of the proposed development any future highway that may be adopted needs to be detailed on an appropriate plan. m floorspace set by NPPF. Analysis and Solutions design of the North Tyneside Cashless Strategy that will revolutionise the way that the council collects revenues for its various products and services. Applicants are strongly encouraged to do this because, National and local validation requirement notes to accompany checklists, Planning applications should be submitted by email/post directly to the relevant local planning authority or online via the. The applicant needs to serve written notice on the person(s) who, on the day 21 days before the date the application is submitted was an owner of any part of the land to which the application relates. Where a development has the potential to impact on priority and protected habitats or species e.g. For the exception test to be passed it has to satisfy each of the following three tests: Core Strategy Policy CS17 Flood Risk and Water Management, Local Plan (2017) S5.10, S5.11, DM5.12, DM5.13, DM5.14, DM5.15, CIRIA: Sustainable Urban Drainage Systems - http://www.ciria.org.uk/, All major development as defined by the Town and Country Planning (Development Management Procedure) (England) Order 2015. North Tyneside Council - About Us. Search and comment on planning applications - South Tyneside Council Edgardo Greco was arrested in France a month ago after 16 years on the run. All design development should be in accordance with the following documents: Non Statutory technical standards for sustainable drainage systems March 2015, Link: https://www.gov.uk/government/publications/sustainable-drainage-systems-non-statutorytechnical-standards, LASOO Non Statutory technical standards for sustainable drainage systems Practice GuidanceSustainable drainage systems: non-statutory technical standards - GOV.UK (www.gov.uk). Core Strategy Policies CS1, CS13, CS15 and CS16, Unitary Development Plan Policies DC1 (g) and MWR35, Sustainability Statements Planning Process Note (November 2021), Site Specific Allocations Policies SA1, SS2, J2 and H2. The development is for alternative sports and recreational provision, the benefits of which clearly outweigh the loss of the current or former use. Use this link to the governments Planning Portal webpage to find out more information about CIL:https://www.planningportal.co.uk/planning/policy-and-legislation/CIL/ab. A Persimmon North East spokesperson said: Were delighted to be working with North Tyneside Council on the exciting plans for Murton Park. Coal Mining Risk Assessment / Mineral Safeguarding. Ownership certificates (A, B, C or D as applicable). PDF North Tyneside Council The County Archaeologist will provide a specification for the building assessment and recording for the applicant which sets out what is required. Recently received planning applications. Identify what risks these coal mining features including cumulative effects pose to new development; Identify how coal mining issues have influenced the proposed development scheme (e.g. Members of the public are now able to make comments on the application on the council's planning portal. South Tyneside Council Town Hall & Civic Offices, Westoe Road, South Shields, Tyne & Wear NE33 2RL. The evaluation must be undertaken by an experienced professional archaeologist. Greens Place South Shields NE33 2AQ 2nd May 2014 North Tyneside Council Where an application is considered to be invalid, the LPA will write to explain what information is required, why any missing information is required and indicate a time period within which this must be provided. Please note: This section is not a validation requirement in South Tyneside. Self-build and custom housebuilding. Hotels, boarding houses and guest houses, development, C2 - Residential institutions - hospitals, nursing homes. Tree Survey and/or Statement of Arboricultural Implications of Development. The relevant certificates concerning the ownership of the application site must accompany all forms of applications. Ecological Survey Assessment and Mitigation Report & Protected Species Survey. The advice could, however, be a material consideration to be taken into account and given weight in the planning application process. Planning Apply for planning permission Find out if you need planning permission and submit an application. The following criteria are provided to help establish when an air quality assessment is likely to be considered necessary, but they are by no means exhaustive: Air quality may require consultation with the statutory consultees e.g. Planning Applications On-Line The governments Policy Framework states that when assessing applications for retail, leisure and office development outside of town centres, which are not in accordance with an up-to-date Local Plan, local planning authorities should require an impact assessment if the development of over a proportionate locally set threshold (if there is no locally set threshold, the default threshold is 2,500 sq. This should include each of the following where appropriate: Unitary Development Plan Policies C2, C2.1, C3.1, GB2.1, GB2.2, GB2.3 and GB2.4 Gateshead, Unitary Development Plan Policies ENV8, ENV12, ENV18 and ENV42. When is this required and what information should be supplied? A Planning Application Additional Information Requirement Form is required to be competed for all relevant applications in Gateshead, North Tyneside and Newcastle to calculate CIL liability. A day in the life of a planning application. Supplementary planning documents and masterplans | North Tyneside Council Floodlighting within 50 metres of woodland, water or hedgerows / lines of trees with an obvious connection to woodland or water; Works to fell or lop veteran trees, trees with obvious cracks, holes and cavities, or trees with a diameter greater than a metre at chest height; Major proposals within 500 metres of the perimeter of a pond, or 200 metres of rivers, streams, canals, lakes or other aquatic habitats such as wetlands; Minor proposals within 100 metres of a pond or adjacent to rivers, streams, canals, lakes or other aquatic habitats such as wetlands; Woodland, or hedgerows / lines of trees with an obvious connection to woodland or water; Gravel pits, quarries, natural cliff faces, or rock outcrops with crevices or caves; European protected sites or candidate sites: Special Protection Area (SPA) / Ramsar Site, Special Area of Conservation (SAC); Site of Special Scientific Interest (SSSI); Site of Local Conservation Interest (SLCI); Priority habitats as defined in the UK Biodiversity Action Plan (BAP) (Refer to Local BAPs and the Natural Environment and Rural Communities Act); A semi-natural habitat. For new development, changes of use and alterations to existing buildings, the transportation and accessibility outcomes of development needs to be set out as part of a planning application. The table at the end of this chapter provides indicative thresholds for when a TS or TA and TP are required. the number of dwellinghouses to be provided is 10 or more; or. There is a procedure in the Town and Country Planning (Development Management Procedure) (England) Order 2015 (under article 12) to resolve such disputes. Financial services banks, building societies and bureaux de change, professional services (other than health or medical services) Estate Agents and employment agencies, other services principally where services are provided to visiting members of the public. Trees and other established landscape features are important to our environment but they are vulnerable to damage during construction work i.e. The proposed development should be shown in context with the site boundary and any existing adjacent buildings including property numbers/names where appropriate. It can take the form of field walking, geophysical survey and trial trenching. The requirements are not prescriptive in every case. Metro scraps plans for Wi-Fi on trains with hope for 'seamless' 4G and 5G signal instead, Items from 3.5m Northumberland country house come up for auction, 'We are virtually living in a concrete jungle now' - flats plans approved in Wallsend, 120 new electric car charging points approved for Northumberland County Hall in Morpeth. The submitted drawings should be at a scale of 1:50 or 1:100 and should explain the proposal in detail. The Phase 1 Land Contamination Assessment compiled following the completion of the conceptual model will determine whether a Phase 2 Intrusive Site Investigation is required. The LPA will use the assessment to appraise the likelihood that archaeological features survive within the site and to determine if further archaeological fieldwork is required. For full or reserved matter applications, there should be clarification, National Planning Policy Framework Chapter 5 and Annex 2 Glossary. The LPA are likely to seek the comments of relevant statutory consultees on the air quality assessment before reaching a decision on the planning application. This should include the maintenance plan setting minimum standards of maintenance over the lifetime, integrating with other green infrastructure and long term funding plan (including annual charges and replacement of SUDS) (refer to CIRIA guidance on maintenance plan. calculated based on the net additional new floorspace being built/created, having subtracted the amount of vacant floorspace on the site (at the time of the planning application being assessed and determined) that is to be re-used/converted or demolished. Retail sale of food goods to the public food superstores, supermarkets, convenience food stores. National Planning Practice Guidance Housing need assessment section. Area specific requirements and further information: Exceptions: Householder extensions and also any development with no ground intrusion. Detached house Detached house interactive guide Terraced house BS 7370-1 to BS 7370-5: Grounds maintenance. It is not necessary to show flower beds, shrubbery and other garden features on the site plans, where they would not be relevant to the planning assessment of the application, particularly in terms of the impact of the development upon its site and immediate surroundings.